  打桩是河南省钢板桩施工中的一个重要环节,应做好打桩工作。那么我们遇到钢板桩不能进去怎么办?
  Piling is an important link in the construction of steel sheet piles in Henan Province. Piling should be done well. So what if we encounter steel sheet piles and can't get in?
  钢板打桩不打桩进去吗?遇到钢板打桩机打桩不能进入的问题,首先要找出问题的原因,如打桩机的机械问题,仍然是一个地质问题。如果是机械问题,则需要对打桩机进行维修,或更换大功率打桩机,如地质条件较健壮可使用90-120振动锤,或500-600机械手打桩机。
  Do not steel sheet piling go in? In the face of the problem that steel sheet piling machine can not enter, we must first find out the causes of the problem, such as the mechanical problem of the pile driver, is still a geological problem. If it is a mechanical problem, it is necessary to repair the pile driver or replace the high-power pile driver. If the geological condition is more robust, 90-120 vibration hammer or 500-600 mechanical hand pile driver can be used.
  如果打桩机没有问题,那就是地质问题了,如果地质条件较强,打桩确实会遇到无法将钢板桩打入土体预期深度的情况。如果地质学是坚固,条件允许的情况下,可以使用泡水,泡沫subterranine土壤是柔软的,需要水来驱动桩试,深度,这种情况适用于要求打钢板桩一般不是特别深,通过泡水可以使钢板桩再次低于1米左右。
专业钢板桩施工租赁
  If there is no problem with the pile driver, it is a geological problem. If the geological conditions are strong, the pile driving will indeed encounter the situation that the steel sheet pile can not be driven into the expected depth of the soil. If geology is strong and conditions permit, water can be used. The foam subterranine soil is soft and needs water to drive the pile test. The depth is applicable to the requirement that the steel sheet pile is not particularly deep, and the steel sheet pile can be lowered by about 1 meters once again through the water.
  如果钢板桩要求设置深度较深,且泡沫水打桩后仍不能带动钢板桩抽吸速度,则需采用水刀打桩法打钢板桩。水刀法是将高压水管绑在钢板桩前,与钢板桩一起,经过高压水枪的冲击,破坏固体地质,使钢板桩顺利进入土体。
  If the steel sheet pile requires a deeper depth, and if the bubbling water can not drive the steel sheet pile after pumping, it is necessary to use the water jet piling method to drive the steel sheet pile. Water knife method is to tie high-pressure water pipe to steel sheet pile, together with steel sheet pile, through the impact of high-pressure water gun, destroy solid geology, so that steel sheet pile smoothly into the soil.