  很多客户通过我们的网站来电话咨询钢板桩施工,所以今天小编来讲解一下钢板桩施工。
  Many customers come to our website to consult the construction of steel sheet piles by telephone, so today's editor will explain the construction of steel sheet piles.
  1. 钢板桩定位应满足设计要求,便于开槽基础土方施工。也就是说,地基最突出的边缘保留了支撑模具和拆卸模具的边缘。
  1. The positioning of steel sheet pile shall meet the design requirements, so as to facilitate the earthwork construction of slotted foundation. In other words, the most prominent edge of the foundation retains the edge of the supporting mold and the dismantling mold.
  2. 基坑开槽钢板桩的支护平面布置应尽量平整有序,避免出现不规则的角点,以便于标准钢板桩的使用和支护布置。尽可能将所有外围尺寸的电路板组件模块组合在一起。
  2. The support plane layout of the foundation pit slotted steel sheet pile shall be as smooth and orderly as possible to avoid irregular corner points, so as to facilitate the use and support layout of the standard steel sheet pile. As far as possible, all peripheral dimensions of the circuit board component modules are combined.
  1. 在整个基础施工过程中,严禁与托架发生碰撞,随意拆下托架,随意对托架进行切割或焊接,开挖、吊装、绑扎钢筋、浇筑混凝土等施工作业中不得放置重物OB。支持对象。
  1. During the whole foundation construction process, it is strictly prohibited to collide with the bracket, dismantle the bracket at will, cut or weld the bracket at will, and no heavy object OB shall be placed during excavation, hoisting, binding reinforcement, pouring concrete and other construction operations. Supported objects.
  第二,垫层的测量
  Second, measurement of cushion
  根据基坑设计断面宽度和坡口开挖量,测量钢板桩的掘进位置线,并用白石灰标记钢板桩的掘进位置。
  According to the design section width and groove excavation amount of the foundation pit, the excavation position line of the steel sheet pile is measured, and the excavation position of the steel sheet pile is marked with white lime.
  3.钢板桩进场及堆放区域
  3. Steel sheet pile mobilization and stacking area
  根据施工进度或现场情况,组织钢板桩进场时间,确保钢板桩施工满足进度要求。钢板桩的桩位应根据施工要求和现场情况,沿支撑线分散布置,避免集中堆放造成二次处理。
  According to the construction progress or site conditions, organize the mobilization time of steel sheet piles to ensure that the construction of steel sheet piles meets the progress requirements. The pile position of steel sheet pile shall be distributed along the support line according to the construction requirements and site conditions to avoid secondary treatment caused by centralized stacking.
  四、钢板桩施工顺序
  IV. construction sequence of steel sheet pile
  挖掘和槽-安装导梁驾驶钢板桩-删除导梁桁条和支持建设-土方开挖基础建设(力传输带)——的支持——地下室主体结构施工-土回填去除钢板桩-钢板桩后退出治疗的差距
  Excavation and trench - Installation of guide beam driving steel sheet pile - removal of guide beam stringer and support construction - earthwork excavation infrastructure (force transmission belt) - Support - Construction of main structure of basement - soil backfill removal of steel sheet pile - gap of steel sheet pile withdrawal from treatment
专业钢板桩施工租赁
  五、钢板桩
  V. steel sheet pile
  钢板桩应堆放在平整、牢固、不受压、不产生较大沉降变形的现场,以达到桩身施工现场的目的。叠加时注意:
  Steel sheet piles shall be stacked on the site which is flat, firm, free from pressure and large settlement deformation, so as to achieve the purpose of pile construction site. Note when stacking:
  (1)今后施工时应考虑堆垛顺序、位置、方向、平面布置;
  (1) stacking sequence, position, direction and plane layout shall be considered in future construction;
  (2)钢板桩按型号、规格、长度堆放,堆放处设置标识;
  (2) steel sheet piles shall be stacked according to the model, specification and length, and signs shall be set at the stacking place;
  (3)钢板桩分层堆放。每层桩数不得超过5根。每一层之间应铺设枕木。
  (3) steel sheet piles shall be stacked in layers. The number of piles in each layer shall not exceed 5. Sleepers shall be placed between each layer.
  以上是小编为您整理的相关咨询关于钢板桩施工,通过这些内容共享,我们对钢板桩施工有一定的理解,如果你想要更深入地理解钢板桩施工市场的信息,你可以联系我们公司推销员,或现场调查、讨论和交流。
  The above is the relevant consultation about steel sheet pile construction arranged by the small editor for you. Through the sharing of these contents, we have a certain understanding of steel sheet pile construction. If you want to understand the information of steel sheet pile construction market more deeply, you can contact our company's salesman, or on-site investigation, discussion and exchange.