首页-新闻资讯-拉森钢板桩主要施工方法!

新闻资讯

来源:http://www.jnlsgbz.com/ 日期:2019-01-21 发布人:admin
拉森钢板桩主要施工方法
  Main Construction Method of Larsen Steel Sheet Pile
  A.拉森钢板桩土方开挖前,根据施工方案要求,拆除施工区域的地下障碍物和地面障碍物并进行处理。
  Before the earthwork excavation of Larsen steel sheet pile, according to the requirements of construction scheme, the underground obstacles and ground obstacles in the construction area are removed and treated.
  B.拉森钢板桩建筑位置或工地控制线(桩)位置、标准水平桩、开槽白线尺寸必须通过检验;并完成预检程序。
  B. Larsen steel sheet pile construction position or site control line (pile) position, standard horizontal pile, slotted white line size must pass the inspection; and complete the pre-inspection procedures.
  C.夜间施工时应提供充足的照明设施;危险区域应设置明显标志,合理安排开挖顺序,防止错挖或超挖。挖掘出的土应用自卸车运到指定的倾倒场。
  C. Adequate lighting facilities should be provided during night construction; clear signs should be set up in dangerous areas, and excavation sequence should be reasonably arranged to prevent wrong excavation or over-excavation. The excavated earth shall be transported by dump truck to the designated dumping site.
  D.拉森钢板桩进入现场的施工机械的道路和卸货设施应事先检查,必要时应做好加固、拓宽的准备。
  D. The road and unloading facilities of construction machinery for Larsen steel sheet pile entering the site should be checked beforehand, and the preparation for reinforcement and widening should be made when necessary.
钢板桩施工租赁
  拉森钢板桩
  Larsen steel sheet pile
  E.拉森钢板桩在机械施工不能操作的地方,边坡修复和井底清理应通过人工配合进行。
  E. Larsen steel sheet pile in mechanical construction can not be operated, slope repair and bottom hole cleaning should be carried out through manual cooperation.
  F.根据现场情况,拟采用沈阳钢铁公司260型挖掘机进行开挖。由于开挖宽度为3-3.5m,在机械开挖时只能就地开挖一次。如在二楼使用挖土机进行分层开挖,则不能在二楼进行开挖。随时测量基坑边线、基坑标高,确保土方施工到位,不超挖,预留10cm人工清洗。
  F. According to the site conditions, the excavator 260 of Shenyang Iron and Steel Company is proposed to be used for excavation. Because the excavation width is 3-3.5m, it can only be excavated in situ once during mechanical excavation. If the excavator is used for layered excavation on the second floor, it can not be excavated on the second floor. Measure the edge line and elevation of foundation pit at any time to ensure that earthwork construction is in place, not over excavation, and reserve 10 cm for manual cleaning.
  G.防止挖掘机撞击桩,干扰底座承重层。
  G. Prevent excavators from impacting piles and disturbing the bearing stratum of the base.
  H.拉森钢板桩在基坑内外(距基坑边缘1米)安装临时排水沟和集水井,并安排专人排水。
  H. Larsen steel sheet pile installs temporary drainage ditches and catchment wells inside and outside the foundation pit (1 meter from the edge of the foundation pit), and arranges special drainage.
  本文由拉森钢板桩整理,更多有关钢板桩施工租赁的相关资讯可以点击我们的官网进行咨询:http://www.jnlsgbz.com/