  在很多种工程中,我们都能看到一种新型建材的身影,包括但不限于建桥围堰、大型管道铺设、临时沟渠开挖时作挡土、挡水、挡沙墙、码头、卸货场作护墙、挡土墙、堤防护岸等工程中发挥重要的作用。
  In many kinds of projects, we can see a new type of building materials, including but not limited to the construction of bridge cofferdams, the laying of large pipelines, the use of retaining soil in the excavation of temporary ditches, water retaining, sand retaining walls, wharf and unloading yard as retaining walls, retaining walls, embankment revetments, etc.
  这种性能的新型钢材,就是拉森钢板桩,又名U型钢板桩。钢板桩于20世纪初在欧洲开始生产,1903年,日本初次通过进口在三井本馆的挡土施工中采用,基于钢板桩特殊的使用性能,1923年,日本在关东大震灾修复工程中大量进口采用。随着我国经济的快速发展,钢板桩挡墙作为一种快捷、、环保的建筑工法得以认可并发展。
  This new type of steel with excellent performance is Larsen steel sheet pile, also known as U-shaped steel sheet pile. Steel sheet pile began to be produced in Europe in the early 20th century. In 1903, Japan imported it for the first time in the retaining construction of Mitsui Museum. Based on the special performance of steel sheet pile, in 1923, Japan imported a large number of steel sheet piles in Kanto earthquake restoration project. With the rapid development of China's economy, steel sheet pile retaining wall as a fast, efficient and environmental protection construction method has been recognized and developed.
                  钢板桩施工租赁
  拉森钢板桩施工前需要进行的一些检查步骤。
  Some inspection steps need to be carried out before the construction of Larsen steel sheet pile.
  (1)首先拉森钢板桩施工要对施工方案非常熟悉,并且更具要求将施工区域内的地下、地上障碍物清除和处理完毕。
  (1) First of all, Larsen steel sheet pile construction should be very familiar with the construction scheme, and it is more required to remove and handle the underground and ground obstacles in the construction area.
  (2)定位控制线(桩)、标准水平桩及开槽的白线尺寸必须严格按照要求检验,进行预检手续。
  (2) The size of positioning control line (pile), standard horizontal pile and slotted white line must be inspected in strict accordance with the requirements, and pre inspection procedures should be carried out.
  (3)施工地段应该设置好明显的警告标识,并且夜间施工时也应该布置好足够的照明设备,按照合理安排施工,挖土过程中产生的废土废料也应该做到及时处理。
  (3) Obvious warning signs should be set up in the construction section, and enough lighting equipment should be arranged during the construction at night. The construction should be arranged reasonably, and the waste soil and waste generated in the excavation process should be treated in time.
  (4)施工机械和施工车辆,也应该做到提前检查,排除潜在的安全隐患,进行维修或者加固工作。
  (4) Construction machinery and construction vehicles should also be checked in advance to eliminate potential safety hazards and carry out maintenance or reinforcement work.
  (5)在机械施工无法作业的部位和修整边坡坡度、清理坑底等,在做好安全措施的情况下由人工配合进行。
  (5) In the parts where mechanical construction cannot be operated, slope trimming, pit bottom cleaning, etc., shall be carried out by manual cooperation with good safety measures.
  值得一提的是,要想钢板桩施工顺利进行少不了优良的钢板桩。
  It is worth mentioning that if the construction of steel sheet pile can be carried out smoothly, excellent steel sheet pile is indispensable.
 