导向架为钢板桩常规施工方法。具有以下优点:施工简便和安全,线型及垂直度控制较为容易。缺点是:安装导向架作业时间长,作业平台要求较高,涂层与导向架剐蹭严重,地质条件较为坚硬时对导梁及作业围栏震动较大,即使改装加宽、安装滑轮和橡胶皮后效果并不明显,同时锁扣部分摩擦较为严重且一次性沉桩深度较浅。
The guide frame is the conventional construction method of steel sheet pile. It has the following advantages: simple and safe construction, easy control of line type and verticality. The disadvantage is that the installation of guide frame takes a long time, the requirement of operation platform is high, the coating and guide frame rub badly, the vibration of guide beam and operation fence is large when the geological conditions are hard, even if the modification and widening, the effect of pulley and rubber skin installation is not obvious, and the friction of locking part is serious and the depth of one-time pile-sinking is shallow.
无导向架为经验施工方法,其优点是:避免涂层剐蹭,可通过钢板桩震动走向调整钢板桩的起震位置,一次性打入深度较深,节省导向架安装及调整时间,日进度相对较高。不足之处是:施工难度较大、危险性较高,线型及垂直度不易控制,地质情况较差时也会引起锁扣及涂层的破损,且同样避免不了桩头撕裂。
As an experience construction method, no guide frame has the advantages of avoiding coating rubbing, adjusting the starting position of the steel sheet pile by the vibration direction of the steel sheet pile, deep penetration at one time, saving installation and adjustment time of the guide frame, and relatively high daily progress. The shortcomings are: the construction is more difficult, the danger is higher, the linearity and verticality are not easy to control, the poor geological conditions will also cause the damage of the lock and coating, and also can not avoid pile head tear.
因此,在同一锤型及沉桩条件下,两种方法都无法完全避免桩头撕裂、锁扣摩擦及摩擦所引起的钢板涂层损坏。就工程类型适用性而言,导向架施工更适用于平面线型要求较高、桩体较长、现场具备降温条件或地质条件较好的沉桩施工;无导向架施工适用于桩体较短、线型及垂直度要求较为宽松、临时性或紧急性较强(如临时钢板桩结构、临时基坑支护结构等)的工况,且主要适用于振动沉桩施工。
Therefore, under the same hammer type and pile driving conditions, both methods can not completely avoid the damage of steel plate coating caused by pile head tearing, lock friction and friction. As far as the applicability of engineering types is concerned, the construction of guide frame is more suitable for piling construction with higher requirements of plane alignment, longer pile body, better cooling conditions or geological conditions on site; the construction without guide frame is suitable for piling construction with shorter pile body, looser requirements of alignment and verticality, strong temporary or emergency (such as temporary steel sheet pile structure, temporary foundation pit supporting structure, etc.), and It is mainly suitable for vibration piling construction.